First draft
No charge
your first draft, on your own job
Send one past report or your blank template, plus one visit's notes, photos or voice memo. Judge the draft on your own work.
For envelope, roofing, restoration and structural consultancies
Send tonight's site notes, photos or voice memo. By 8 a.m. your time, the draft report is in your inbox: in your own Word template, photos placed and numbered, ready for your engineer to review and seal.
Roof review - 4-storey condo - Bldg B R1 NE corner: membrane blisters x6, largest ~150mm dia. pics 4-6 S parapet cap flashing: 2 laps open, sealant failed. pic 7 D2 partly blocked w/ debris. ponding approx 2m x 3m, ~20mm deep. pics 8-9 no access to mech penthouse roof rec: clear D2 asap, reseal laps
Roof Condition Review
Building B · Section 4, Observations
4.2 Roof membrane
Six blisters were observed in the roof membrane at the northeast corner of roof area R1. The largest was approximately 150 mm in diameter (Photos 4 to 6).
4.4 Roof drainage
Roof drain D2 was partially blocked with debris. Ponding approximately 2 m by 3 m was observed (Photos 8 and 9). [CONFIRM: location of the ponding]
Sample (fictional building)
How it works
Tonight
Email the day's notes, photos or voice memo. The first time, add one past report or your blank template. You can redact client names first.
By 8 a.m. your time
An editable Word file in your template and your firm's wording, with photos placed and numbered. Anything missing from your notes is marked [CONFIRM], never guessed.
Your engineer
They edit what they want, seal it and send it to your client as usual. Nothing goes out under your seal without their approval.
Voice memo
Sample (fictional building)
Added to the draft, in your template.
Nothing is sealed or sent without your engineer's review.
Example
Sample report (fictional building)
Roof review - 4-storey condo - Bldg B R1 NE corner: membrane blisters x6, largest ~150mm dia. pics 4-6 S parapet cap flashing: 2 laps open, sealant failed. pic 7 D2 partly blocked w/ debris. ponding approx 2m x 3m, ~20mm deep. pics 8-9 no access to mech penthouse roof rec: clear D2 asap, reseal laps
Building B · Roof review · Section 4, Observations
Six blisters were observed in the roof membrane at the northeast corner of roof area R1. The largest was approximately 150 mm in diameter (Photos 4 to 6).
At the south parapet, the cap flashing lap joints were open at two locations, and the sealant at these joints had failed (Photo 7).
Roof drain D2 was partially blocked with debris. Ponding approximately 2 m by 3 m in area and approximately 20 mm deep was observed (Photos 8 and 9). [CONFIRM: location of the ponding relative to D2]
The mechanical penthouse roof was not accessible during this review and was not reviewed.
Clear the debris from roof drain D2 as soon as possible, and reseal the open lap joints in the south parapet cap flashing.
Every number in the draft comes from the notes. The recommendations are the engineer's: we word them, we don't make them.
Built for reports that carry a seal
If it isn't in your notes or photos, it isn't in the report. Gaps come back marked [CONFIRM].
Your engineer reviews, edits and seals every report, and stays responsible for it.
They're used only for your firm's reports, and deleted when you ask.
Not for another firm, and not as a sample or in marketing without your written OK.
Prices
No charge
your first draft, on your own job
Send one past report or your blank template, plus one visit's notes, photos or voice memo. Judge the draft on your own work.
US$75
per report you keep
Your draft by 8 a.m. the next morning.
US$375
for 30 days
Full refund if we miss any one of these:
Questions
Anything else: sai@afterwalkai.com
Email one past report or your blank template, plus one visit's notes, photos or voice memo. The draft comes back by 8 a.m. your time, at no charge.
Send a sample jobsai@afterwalkai.com